I. Executive Summary
This report fully demonstrates the manufacturing capacity, quality control system and proven successful track record of Xiamen Haierde Environmental Protection Co., Ltd. in the building materials sector. In response to the specific requirements of Longhai Baishui Water Supply Co., Ltd., our company commits to supplying high-quality products complying with national industrial standards and ensuring on-time, high-quality delivery of the project.
II. Project Requirements
Our company has conducted in-depth analysis and corresponding responses to the procurement needs of Longhai Baishui Water Supply Co., Ltd., as detailed below:
1.Product Specifications
In accordance with the requirements of Longhai Baishui Water Supply Co., Ltd., our company supplies brand-new PE water supply pipes with specification PE 315*0.8 made of virgin PE material, which completely resolves the "yellow water" issue caused by old pipelines troubling Longhai Baishui Water Supply Co., Ltd.
2.Standards Compliance
All PE water supply pipes delivered from our factory are manufactured in strict accordance with GB/T 13663.2-2018 Polyethylene (PE) piping systems for water supply — Part 2: Pipes, guaranteeing one-time successful project acceptance inspection.
III. Project Implementation and Supply Chain Management
1.Production, Logistics Arrangement and Services
Upon contract signing, goods will be delivered by late May 2026 in accordance with the construction schedule of Longhai Baishui Water Supply Co., Ltd. Copies of national standard test certificates and other supporting documents will be provided together to match the construction timeline.
2.Deliverables
The final project passed completion acceptance with a 100% qualification rate and received positive feedback from Longhai Baishui Water Supply Co., Ltd.






Null
关闭返回